
What's included
- Full demolition & debris removal
- Framing & drywall for new layouts or partition changes
- Electrical rough-in — outlets under-cabinet lighting
- appliance circuits
- Plumbing modifications — sink relocation dishwasher hookup
- Custom cabinet installation ##and## built-in storage
- Countertop installation — quartz marble granite butcher block
- Backsplash tile installation — including custom cuts & epoxy grout
- Flooring — hardwood luxury vinyl or tile
- Appliance installation & hookup
- Furniture & interior design coordination (available on request)
- Final clean-up & walkthrough
Why NYC Homeowners Choose Paun Craft for Their Kitchen

01. One Team Handles Everything
Kitchen renovations fall apart when five different contractors can't agree on sequencing. We manage every trade in-house — electrical, plumbing, tiling, cabinetry, flooring — in the right order, on schedule. You have one point of contact from demo to final walkthrough.

02. No Surprise Costs Mid-Project
We give you a detailed written estimate before any work begins. If something unexpected comes up behind the walls — and in NYC apartments, it sometimes does — you hear it from us immediately, not after the fact.

03. Fast Turnaround, Minimal Time Without a Kitchen
We know losing your kitchen for weeks is a serious disruption. We sequence the work carefully to move efficiently — most kitchen remodels are completed in 2–4 weeks depending on scope.

04. Precision Finishing on Every Detail
From perfectly aligned subway tile backsplash to seamless countertop joints — we treat every kitchen like it's going into a design magazine. Because in NYC, the details are what people notice.
How We Work

Free On-Site Assessment
We visit your kitchen, assess the full scope — existing plumbing, electrical, layout constraints — and give you a clear written estimate within 48 hours. We'll flag any potential issues before work begins, not after.

Demo Rough-In & Build-Out
We strip the kitchen down, handle all plumbing and electrical rough-in, frame any new walls or changes, and install drywall — in the correct sequence so nothing has to be redone.

Cabinets Tile Countertops & Finish
Once the structure is solid, we install cabinetry, lay the tile, fit countertops, hook up appliances, and finish every detail. We leave your kitchen clean, functional, and ready to use.
Need furniture? We work with trusted local suppliers and can coordinate complete furnishing as part of your renovation package — from design consultation to final delivery and installation.
FAQ
Most kitchen remodels take 2–4 weeks depending on scope. A full gut renovation with layout changes takes longer than a cabinet and countertop refresh. We give you a realistic timeline upfront and stick to it.
Yes. We work with trusted local suppliers and can coordinate complete furnishing as part of your renovation package — from design consultation to final delivery and installation.
Yes — we can relocate plumbing, move walls, and reconfigure the layout as part of the remodel. We'll assess the feasibility during the on-site visit and factor it into the estimate.
Both options work. We can source and supply materials through our trusted suppliers, or we can install materials you've already selected. We'll advise on what works best for your budget and timeline.
Yes — we work with trusted interior designers and furniture suppliers and can coordinate the full package if needed. Just let us know during the assessment.
Every kitchen is different. Rather than publish numbers that won't reflect your actual project, we offer a free detailed on-site estimate — so you know exactly what you're paying for before any work begins.