
What's Included in a Full Renovation
Every full renovation project we take on covers the complete scope of work:
- Full demolition & debris removal
- Electrical rough-in & plumbing relocation
- Wood & metal stud framing for new walls and partitions
- Moisture-resistant drywall (sheetrock) & cement board where needed
- Waterproofing & insulation
- Tile installation — floor, walls, custom cuts & epoxy grout finishing
- Hardwood & luxury vinyl flooring
- Painting, decorative finishes & Venetian plaster
- Doors, windows & trim installation
- Final fixtures, fittings & clean-up
Why NYC Homeowners & Business Owners Choose "Paun Craft"

01. One Team From Start to Finish
Too many renovation projects in NYC fall apart because five different contractors can't coordinate. With Paun Craft, one team handles every trade. No finger-pointing. No "that's not my job." We own the entire process.

02. Fast Turnaround Without Sacrificing Quality
Speed and quality aren't enemies — poor planning is. We show up every day, stick to the schedule, and don't leave your project sitting idle while we're off on another job. Most full apartment renovations are completed in 4–8 weeks.

03. Transparent Pricing, No Surprises
You get a detailed estimate before we start. If something unexpected comes up during demo — and sometimes it does in NYC buildings — we tell you immediately, not after the fact.

04. Boutique-Level Craftsmanship
From Geberit plumbing systems to 45° mitered tile cuts with epoxy grout — we apply the same precision on a Staten Island apartment as we do on a Manhattan commercial space. The details matter to us because they matter to you.
How It Works

Free On-Site Assessment
We visit your space, walk through the full scope of work, and give you a clear written estimate — usually within 48 hours. No vague numbers, no pressure.

Full Execution, On Schedule
Our team handles every stage in the correct sequence. You get regular updates without having to chase anyone. We treat your space with respect — protected floors, contained dust, clean site at the end of every day.

Final Walkthrough & Handover
Before we call it done, we do a thorough walkthrough with you. Every finish is inspected, every detail reviewed. We don't hand over the keys until you're genuinely satisfied.
Need furniture? We work with trusted local suppliers and can coordinate complete furnishing as part of your renovation package — from design consultation to final delivery and installation.
FAQ
It depends on the scope, but a typical apartment renovation runs 4–8 weeks. We give you a realistic timeline during the assessment and stick to it. If anything changes, you'll hear it from us first — not discover it yourself.
Yes. We work with trusted local suppliers and can coordinate complete furnishing as part of your renovation package — from design consultation to final delivery and installation.
For a full renovation, in most cases yes — at least for the main construction phase. We'll be upfront about this during the site visit. We work efficiently to minimize the time you're displaced.
Every project is different, which is why we don't publish fixed prices. What we do offer is a free, detailed estimate after seeing the space. You'll know exactly what you're paying for before any work begins.
For most finishing work, permits aren't required. For structural changes or plumbing and electrical work, we'll guide you through what's needed and help coordinate the process with the building.
Yes — Manhattan, Brooklyn, Queens, The Bronx, and Staten Island. We also take select projects in New Jersey.