
What's Included in a Bathroom Remodel
- Full demolition & debris removal
- New framing & partitions where needed
- Moisture-resistant drywall & cement board installation
- Professional waterproofing — walls, floor & wet zones
- Shower drain & trap installation
- Plumbing modifications & fixture relocation
- Floor & wall tile installation — including custom cuts & mitered edges
- Epoxy & cement grout finishing
- Shower door & glass partition installation
- Vanity, toilet & all plumbing fixtures
Why New Yorkers Trust "Paun Craft" With Their Bathrooms

01. Waterproofing Done Right — Every Time
In a NYC apartment building, a failed waterproofing job doesn't just ruin your bathroom — it damages the unit below and can cost you thousands in liability. We apply professional-grade waterproofing on every surface before any tile goes down. No shortcuts, no exceptions.

02. Precision Tile Work, Including Custom Finishes
We work with all tile types and formats — large format, mosaic, porcelain, natural stone. Our team cuts 45° mitered edges, applies epoxy grout for long-lasting joints, and handles even the most delicate custom tile work. If you've seen our custom porcelain sink — you know what we mean.

03. Full Scope, One Team
Too many bathroom renovations in NYC stall halfway because the tile guy won't touch the plumbing and the plumber won't coordinate with the tiler. We handle everything in-house — no gaps, no finger-pointing, no half-finished bathrooms.

04. Fast Turnaround, Minimal Disruption
We know losing your bathroom for weeks is a serious inconvenience. We plan the work sequence carefully to complete the project as efficiently as possible — most bathroom remodels are done in 1–3 weeks depending on scope.
How We Work

Free On-Site Assessment
We visit your bathroom, assess the full scope — including existing plumbing, tile condition, and waterproofing status — and give you a clear written estimate within 48 hours. We'll flag any hidden issues before work begins, not after.

Demolition & Build-Out
We remove everything down to the studs, install cement board, apply waterproofing, and rough in any plumbing changes before a single tile goes down. The foundation has to be right — that's where most bathroom renovations fail.

Tile, Fixtures & Final Finish
Once the structure is solid, we lay the tile, install fixtures, hang the shower door, and finish every detail. We leave your bathroom clean, sealed, and ready to use.
FAQ
Most bathroom remodels take 1–3 weeks depending on scope. A full gut renovation with plumbing changes takes longer than a tile-and-fixture refresh. We give you a realistic timeline during the assessment and stick to it.
Yes — we coordinate all plumbing work as part of the full scope. This includes fixture relocation, new drain installation, and all rough-in work needed for the renovation.
We work with all tile types — porcelain, ceramic, natural stone, large format, mosaic. We also do custom cuts including 45° mitered edges and can work with epoxy or cement grout depending on your preference and the application.
Yes — always. In NYC apartment buildings especially, proper waterproofing protects not just your bathroom but the unit below you. We never skip this step, even on smaller remodels.
We can try, but an exact match isn't always possible depending on the tile age and manufacturer. We'll be upfront about this during the assessment so you can make an informed decision.